Explain what is SAP PP?
SAP PP process is related to production planning of a company and it encompasses all activities like MRP (Material Requirement Planning), BOM (Bills Of Material), Routing, Capacity planning, etc. but mainly it contains two segments
Material Planning: Material requirements planning, long term planning,
Execution Planning: Creation of production order, workflow, conformations, technical completion and good movement
Mention what are the production process in SAP?
There are three types of production process in SAP
Discrete Manufacturing
Repetitive Manufacturing
Production- Process Industries
List out the activities carried out in Production Planning?
Activities involved in Production Planning includes
Processing material master
Creation of Bill of Material
Displaying work center and routing
Maintaining planning calendar
Maintaining production lot
Maintaining quota file
Defining range of coverage profile and profile for safety time
Defining MRP views
Are you Looking for SAP Production Planning Training? Please Enroll for Demo SAP Production Planning..! |
Explain what is Routing in SAP PP?
Routing in SAP PP is referred to a list of activities which are required to produce any material. For example, when you do cost estimation for the material, the system triggers the relevant routing and activity rates for all those described in routing. Which will helpful to calculate the processing cost in product costing.
What are the steps of Production Execution Process?
Production Execution steps include
Converting planned order to production order
Releasing the production order
Goods issue for production order
Confirmation of production order
Goods receipt against production order
What are the reports generated in product cost controlling information system?
Product Cost Controlling information system generates information for following areas
Product cost planning
Cost object controlling with the subcomponents
Product cost by period
Product cost by order
Product cost by sales order
Costs for intangible goods and services
Actual costing / Material Ledger
How to insert an inspection checkpoint at the end of an operation?
If in process sample is to be defined, assign inspection type 03 in the Material Master.
Then create MICs and assign them in the Routings.
System automatically generates the Inspection Lots
Where we have to specify the teardown time in one operation?
Teardown time can be defined as one of the Standard Parameters…
How the process time is calculated in a WC when both labour, Machine categories exist?
Scheduling is done based on the Capacity Category we define in the Workcenter
Can MRP be carried out for one particular level of a bom ( Level code : 0001/0002 etc).
Yes it can be done by running for specific materials (Single Material Single Level)
What is opening period?
Opening period
The opening period represents the number of workdays that are subtracted from the order start date in order to determine the order creation date. This time is used by the MRP controller as a float for converting planned orders into purchase requisitions or into production orders.
What is SLA ? Service Level Agreements
Service Level Agreements (SLA) define the attributes for service products (for example, maintenance, Hotline) that have been agreed upon with the customer in service contracts. The SLA confirms different parameters, such as response time, availability time and system availability.
What are Basic Dates?
Earliest date for the execution of the production order. This date takes into account the float before production.
If, on order creation, a planned order exists for the production order or process order, then the order dates are taken from the planned order. When scheduling the production order the system tries to adhere to the order dates (if necessary, with reduction measures).
If it is not possible to adhere to the basic dates and if the control parameter in Customizing allows the basic dates to be adjusted, the system adjusts the basic dates of the order during the scheduling run.
If the control parameter in Customizing does not allow the basic dates to be adjusted, the order keeps the basic dates of the planned order.
If the production order is created manually, you must enter at least one order date manually.
The scheduling type determines, which order dates you must enter.
What is planning time fence?
The planning time fence specifies a period within which no automatic changes are to be made to the master plan.
The planning time fence is maintained in workdays.
What is Planning Horizon?
In this step, you define the planning horizon. This planning horizon specifies the period for the “Net change planning in the planning horizon”.
In this kind of net change planning, only those materials that have undergone a change that is relevant to MRP within the planning horizon are included in the planning run. Such materials receive a net change planning indicator in the planning file.
You make this specification for a plant. You can define an alternative planning horizon for MRP groups
How do you check the costing details in Production Order?
You can check this in CO02 select Cost → Analysis and you can check the cost of Production Order.
What is Plan cost, Actual cost and Target cost?
Plan Cost = Planned Quantity X Planned Price
Actual Cost = Actual Quantity X Actual Price
Target Cost = Actual Quantity X Planned Price
Are you Looking for SAP PP Online Training? Please Enroll for Demo SAP Production Planning..! |
What do you understand by Sales and Operational planning?
SOP is forecasting tool that allows you to set the sales, production, and other supply chain targets based on existing, future, or historical data. SOP is most commonly used for finished goods.
What are the different components under SOP?
SPO consists of following two components −
Standard SPO it is predefined in the system.
Flexible SOP You can configure it in multiple ways.
Which Transaction code is used to cancel the Production Order?
Use T-code: CO13
Enter order number and click on tick mark at the top. You will be prompted to confirm the action.