• LOGIN
  • No products in the cart.

Tibco CIM (MDM) Interview Questions

How MDM is Different

TIBCO MDM offers a set of unique features and capabilities including: Scalable Data Model The structure and services of data models such as a global data synchronization network (GDSN), an ACORD-based data model, and/or any existing metadata that is required. This can then be increased from the general user interface (UI). Under the hood, TIBCO MDM automatically generates the necessary tables and columns to reflect the logical model formed.

What is MDM?

TIBCO MDM (MASTER DATA MANAGEMENT) is an event-driven solution designed specifically for fast-paced, multi-party, and multi-tier sharing environments. Combining an extensible master data storehouse and real-time data synchronization with a strong rules-based work flow engine, this solution can rapidly obey with ever-changing requirements, while automating accessible manual business processes involved with managing master data. Out-of-the-box functionality includes support for multi-party, multi-tier teamwork among all parties that need to create, manage, and synchronize master data, enabling organizations to apply and start using the application quickly.

What is Data Warehousing?

data warehouse is the main repository of an organization’s historical data, its corporate memory. It contains the raw material for management’s decision support system. The critical factor leading to the use of a data warehouse is that a data analyst can perform complex queries and analysis, such as data mining, on the information without slowing down the operational systems. Data warehousing collection of data designed to support management decision making. Data warehouses contain a wide variety of data that present a coherent picture of business conditions at a single point in time. It is a repository of integrated information, available for queries and analysis.

Tibco CIM (MDM) Corporate Training

What are two accurate descriptions of a record that has conflict?

A record has three versions and the same attribute in all versions has different values.
A record has two versions and the same attribute in both versions has different values.

What can be used to retrieve all records that match a value across all repositories?

Text Search

Key Features of TIBCO Collaborative Information Manager

Rules engine to validate and transform information inbound and outbound
Flexible data model with powerful capabilities to manage cross-domain relationships and hierarchies
Process/workflow engine to automate processes for master data creation and maintenance; graphical process modeler
Out-of-the-box, information synchronization capabilities ranging from simple file-based exchanges to real-time bus-based integration
Web services API to utilize meta and master data in external processes, services, and portals and build a data services platform
Embedded distributed cache, multi-threading, and asynchronous processing for high volume, high throughput environments
Role and value based access and security
Business-friendly interface, web 2.0 UI technologies
Information search, reporting, and auditing capabilities

Characteristics of Collaborative Information Manager

Loosely Coupled Product Architecture
Metadata Driven
Thin client application
Event-driven real-time architecture
High Performance
Adherence to standards

What are three special transitions for the purpose of processing exceptions?

Timeout
Error
Cance

Which activity must be used to send an e-mail message?

Send

Which statement is true about installing TIBCO MDM in a clustered environment?

A)CIM instances in the cluster must run on the same JVM version.
B)Load-balancer is required when CIM instances must be clustered.
C)Load balancer is always required to handle HTTP requests to multiple application servers.
D)Each application server can run on a different JVM version.

ANS: A

What are two accurate descriptions of a record that has conflict?

a) record has three versions and the same attribute in all versions has different values.
b) A record has two versions and the same attribute in both versions has different values.

What are the different types of Transactions TIBCO provides?

TIBCO BusinessWorks offers a variety of types of transactions that can be used in different situations. You can use the type of transaction that suits the needs of your integration project. When you create a transaction group, you must specify the type of transaction. TIBCO BusinessWorks supports the following types of transactions:
JDBC
Java Transaction API (JTA) UserTransaction
XA Transaction

Which security mechanisms are supported in TIBCO BusinessWorks?

username / password
certificate / private key and SSL

A TIBCO BusinessWorks application you are developing uses JMS messaging where the messages only reside on the local campus. How should you implement conversation level security?

Provide the appropriate certificates and define the connection used by the message producers and consumers to use SSL

Which statement is true about the maximum number of EAI steps allowed in a process?

A.There is no limit.
B.A process may contain up to 20 EAI steps.
C.A process may contain up to 40 EAI steps.
D.The maximum number of EAI steps allowed in a process is configurable in the STAFFCFG file.
Answer: A

Which two Record permissions should be denied to prohibit a user from adding new records? (Choose two.)

A.Copy
B.Modify
C.Create
D.Compare
E.Full Control
ANS : A,C

When a Record Add workitem is rejected and sent for correction, which Business Process Rule must be set to create a new workitem?

Data Custodian

Tibco CIM (MDM) Training

Copy metadata allows you to export or import which four objects?

1) Output Map
2) Synchronization Format
3) BusinessProcess Rules
4) Repository

What is used to group a set of related attributes together in a repository?

Attribute groups

Which two statements are true about workitems? (Choose two.)

A. All approval workitems must be ASYNCHR in execution mode.
B. Another workitem must be created for users who have already had a workitem in a particular event.
C. The number of workitems that need to be completed can be configured in the workflow.
D. The default action of the ManageWorkitem activity is to CLOSE a workitem.

Solution: C,D

November 26, 2019
GoLogica Technologies Private Limited. All rights reserved 2024.